Specifications PELLBOX SCF
10LOCATION AND AIR CHANNELLING (fig. 3) A: adjacent room B: anchor plugs to support insert (must be fix
11CHANNELLING The insert has an opening on the left side (see location p. 7 DIMENSIONS) to channel hot air into an adjoining room or the same room as
12INTERFACE: OPERATION Before ignition. 1st Ign
13Automatic operation using the remote control Press the Menu key to switch to automatic operation and set the temperature required in the room (to a
14OPERATIONS WHICH CAN ONLY BE CARRIED OUT USING THE REMOTE CONTROL Clock adjustment Hold the menu key down for two seconds to access the clock menu
15Note on flame variability Any variations in the state of the flame depend on the type of pellet used, the normal variability associated with solid
16ADVICE IN THE EVENT OF PROBLEMS DISPLAY-CONTROL PANEL/SAFETY DEVICES PROBLEM CAUSE SOLUTIONS display-control panel off no mains voltage make su
17ADVICE IN THE EVENT OF PROBLEMS 1) No Depression (this trips if the flow sensor detects insufficient combustion air flow). The flow may be insuffi
18SERVICING Regular maintenance is essential for good insert operation Before carrying out any maintenance, disconnect the device from the mains pow
19FAILURE TO CARRY OUT MAINTENANCE LEADS TO FORFEITURE OF THE GUARANTEE. OPTIONAL EXTRAS: REMOTE IGNITION BY TELEPHONE (cod. n. 281900) The insert ma
2PELLBOX SCF SPECIFICATIONS INDEX Miscellaneous and safety information p. 2 Operating principle and fuel notes p. 3 Exploded vie
20CHECK LIST Read the entire specifications before using this list Installation and setup ¾ Installation carried out by an authorized TAC which has
3 –OPERATING PRINCIPLE PELLBOX SCF is a pellet-fired insert that manages pellet combustion electronically. The fuel (pellets) is taken from the stor
5
6TECHNICAL AND HEATING SPECIFICATIONS Hopper capacity 25 kg Efficiency 90 % Available power (min/max) 3/10 kW Time between refuellings (min/max)
7DIMENSIONS (fig. 1) A: rear view B: front view C: side view D: view from above Hot air outlet Smoke
8ASSEMBLY AND INSTALLATION (TAC - technical assistance centre) Refer to the local regulations in the country of use for anything not expressly shown.
9POSSIBLE INSTALLATION LAYOUTS (fig. 2) A: internal flue up to roof B: external brick-built flue
Commentaires sur ces manuels